SAP Resume

Don K. Dennis
56 Old Town Road
Irving, Texas 75459

PROFILE:

  • 6+ years of Functional Expertise in SAP MM, PM & PP with touch points in Purchasing, WM, and FI/CO.
  • Involved in over 40 implementations Globally.
  • 3+ years as Global Manager for MM functions covering 120 sites.
  • Skilled in 3.0, 4.5 and 4.6 clients of SAP
  • PP/MM Configuration enhancement skills in 4.5 & 4.6

TECHNICAL SKILLS:

  • SAP Clients DEC Unix 4.0 D , AIX 3.0, 4.5B, 4.6C with configuration in 4.5B and 4.6C
  • Internet HTML. Training webpage designer.
  • Client / Server Oracle Forms/Reports, VB, Access, Crystal Reports, COBOL400, RPG400.
  • Applications Windows 2000, Windows NT, Access, Power Point, Microsoft Word, Microsoft Access, Lotus Notes, CSI Vibration Analysis
  • Industries Automotive, Food and Beverage, Aircraft, Paper, Pharmaceutical, Industrial

EDUCATION/CERTIFICATION:

  • HTML Certification-Techneon Learning Institute
  • SAP Boot camp-Garden and Plants
  • TSTI Assoc. of Mech
  • Almeda BS CS

PROFESSIONAL EXPERIENCE:

Techneon AIS, Irving, Texas
04/2001 to present
SAP Implementation/Sustaining Manager

  • Co-Lead PP upgrade from 3.1 to 4.6C.
  • Mapped system requirements for Job Functions.
  • Led As Is To Be functions in the upgrade from SAP 3.1H to SAP 4.6 for PP module.
  • Created / presented Training materials for upgrade.
  • Designed and implemented training materials for End Users highlighting upgrade enhancements and new functionality.
  • Enhancement Configuration of Navigational Profiles.
  • Gathered information from Business Units on screen navigation downtime and configured Navigation buttons for great user speed to work.
  • Enhancement Configuration of MRP Controllers, mail delivery and screen displays.
  • Led MRP Automation Project.
  • Configured UOM project enhancement.
  • Created various MRP, Planning, Purchasing SAP Training Webpages.
  • Utilized HTML experience to role out User Friendly Webpages for End Users and Management to view the latest enhancements and Problem Fixes.
  • Configured Planning Time Fence project.
  • Gathered system requirements for MRP/Planning to utilize Planning Time fence to more closely adhere to Production Schedules.
  • Designed Security Profile Upgrades for MRP Users.

Garden and Plants, Malden, Ohio
03/1999 – 04/2001
Global MM Manager

  • Global leader for MM implementations.
  • Mapped As Is-To Be system requirements for Implementations.
  • Coordinated system upgrades i.e. quarterly system enhancements and 3.0 to 4.5 upgrade.
  • Led MM efforts with e-Business team to develop and implement MM requirements for on-line catalog ordering and EDI Purchase Order delivery.
  • Designed Basis specifications for Auto Material creation.
  • Developed all training material, Job Aids, Presentations, CBA s.
  • Gathered system requirements for End User to Super Users and designed and implemented training.
  • Designed Global Security Profiles for Security Team.
  • Designed Role layouts and worked with Security Team to role out for 120 sites.
  • Configuration Enhancements for MM module, MRP Mail receipt, Inventory Work Process etc.
  • Worked with End Users and ABAP Team to map and deliver a wide range of reporting and automated upload tools.
  • Managed 3 teams of 10 Globally.
  • Managed Project timeline and milestones for each team.
  • Managed budget for each team.
  • Member of Change Review board.
  • Led User Conferences for 4 regions End Users to roll out new functionality and updated training.
  • Venue of all End Users in each of the 4 regions attended for New Enhancements and functional training packages.

Garden and Plants, Arlington, Texas
09/1998 02/1999
North American Implementation Team Leader

  • Performed data clean up from legacy to SAP. Conversion of all materials to Global Standard, Creation of materials in SAP Client, and download to site.
  • Performed over 100 training classes for SAP, MM, and PM.
  • Developed Work Process Flows for Departments.
  • Mapped each work process per SAP role and delivered for Standardization of 120 sites Globally.

Garden and Plants, Arlington, Texas
09/1990 06/1998
Manager

For this Manufacturing Facility I managed various pieces of the business. My main direction was the MM/PM functional areas.

As Storeroom Manager:

  • Managed 5 person team and SR Inventory over 2 million dollars. Day to day included MRP evaluation, stocking level reduction to reduce overhead by 1 million.
  • Baseline reduction in stocking time of SR materials. Created Vendor relations program to enhance service abilities. Led Baseline Project Team to map Slowdowns in Material Replenishment.
  • Led EOQ Economic Order Quantity Team to reduce Purchasing costs plant wide.

As Lubrication Owner:

  • Designed New Storage Facility and distribution site for plant.
  • Did baseline study of current usage and reduced by 60 variations of stocked lubricants.
  • Implemented Corporate standards for TPM pillar.
  • Led contract negotiations to reduce costs by 50 .

As Technical Manager :

  • Held International Vibration Analysis Certification Level 1.
  • Designed Vibration Analysis Maintenance program. Certified on CSI equipment and programs.

Wal-Mart Automotive
12/1986 09/1990
Manager

Managed all day to day activities of #2 producing shop in Nation.

REFERENCES:

References will be furnished upon request.

Advertisements
Categories: SAP Resume | Leave a comment

Post navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: